You are here: Home » News » How Does The Double-box Underground Garbage Station Operate?

How Does The Double-box Underground Garbage Station Operate?

Views: 15     Author: Site Editor     Publish Time: 2026-01-27      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button


Overall Concept

垃圾中转流程方案


Product Introduction

Double-box Underground Garbage Station

The landscape underground design is adopted, with the main equipment deeply buried underground, only the feeding ports remaining on the ground. This facilitates garbage disposal and effectively isolates odors, reduces air pollution, inhibits the breeding of mosquitoes and flies, improves environmental hygiene, avoids visual pollution, and achieves harmonious integration with the surrounding landscape.

Large capacity design: Equipped with 2 garbage bins with a capacity of 8 cubic meters each, the total capacity of the two bins reaches 16 cubic meters, providing sufficient storage space for urban garbage and easily meeting the storage needs for large amounts of garbage. The dual-bin design ensures continuous operation of the garbage transfer station 24 hours a day through the alternating transfer and circular collection and transportation mode. Garbage is transferred daily and cleared, ensuring smooth operation and efficient, uninterrupted garbage transfer.

Affordable equipment cost: Easy to operate, low maintenance cost, equipped with an ordinary 5-ton dump truck, only two fixed chains need to be added, no special vehicles are required, reducing procurement costs. The later maintenance and upkeep are simple and inexpensive.

双箱2  双箱  双箱1



Working Process

Item

Specification

Power Unit

Model number

Y132S-4

Power

5.5KW( 380V)

Speed

1450r/min

Gear Pump

Model number

SP20-11AS3H6-L

Displacement

11.1ml/r

Rated Pressure

20.6MPa

Else

Volume

8m³×2

Lifting height

3.3m

Lifting weight

6000kg

Lifting time

约90-110s

Pit size(Length × Width × Height)

6780×3700×2454(mm)

Weight

4500kg

Number of operators

1-2 

 双箱垃圾站9



双箱         双箱垃圾站7



Matching vehicle

Using a regular dump truck, no major modifications to the vehicle are required. Only two chains need to be installed. During the garbage transfer process, the chains can securely connect the transfer station and the dump truck, preventing the box from moving during garbage dumping. After the transfer is completed, the dump truck can resume its original use for transporting other goods, without affecting its original functions and improving its flexibility in use. This avoids the high purchase and maintenance costs of dedicated garbage transfer vehicles.

4a987ba6f2f90bcf3c2dd3eea1b79800


CONTACT INFO

Landline: +86-0538-8580-066
Phone: +86-188-5380-9997
E-mail: lily@sdrnkj.com
WhatsApp: +8618853809997
Add: 1101, West Tower, Taian National Hi-Tech Center, No. 28, Zhengyangmen Street, Taian, Shandong, China

QUICK LINKS

PRODUCTS CATEGORY

Contact Us
Copyright © 2025 Shandong RNKJ Environmental Technology Co., Ltd. All Rights Reserved.| Sitemap | Privacy Policy