Views: 0 Author: Site Editor Publish Time: 2025-06-11 Origin: Site
1. First, the sanitation workers pour the bulk waste concentrated in the waste transfer station into the compression box. When the waste is loaded to the upper plane of the compression, the operator starts the hydraulic system. Under the action of the squeezing oil cylinder, the pressure head presses down to the waste compression box, and compresses the loose waste in the waste compression box into blocks. Because of the constraints of the waste box and the squeezing oil cylinder, the pressure head must be raised to the maximum height each time the pressure head squeezes the waste, and then the safety lock hook button is operated to lock the lock hook on the upper frame.
2. After the waste in the waste compression box is loaded to the upper plane of the compression box again, the operator starts the hydraulic system again. The pressure head squeezes the waste in the compression box again. This cycle of squeezing waste.
3. When the compressed waste reaches a height of 1.1 meters, the operator operates the middle gate raising button to operate the middle gate cylinder, lift the middle gate, and then operate the push plate cylinder button to operate the push plate cylinder to push the waste that has been compressed into blocks into the waste storage box. After the relevant operations are completed, the push plate is returned to its original state, and the middle gate is dropped to carry out the next cycle of squeezing waste.

4. When the second piece of waste is squeezed, the operator starts the hydraulic system, operates the hanging box lifting button to lower the pressure head to the hanging box position, and then operates the hanging box button to operate the hanging box cylinder, and the hanging box slide pin on the pressure head is inserted into the four lifting rings on the waste compression box. Then operate the raising button to make the pressure head lift the waste box. After it is raised to above the bottom height of the waste transport car compartment, operate the front and middle gate raising buttons to lift the front and middle gates.
5. Back up the garbage truck with the rear door open, so that the front part of the garbage box enters the garbage truck box. The operator operates the push plate button to push the two pieces of garbage that have been compressed into blocks into the car box.
6. After the garbage truck drives away, lower the front and middle gates on the garbage box. Then use a high-pressure water gun to flush the garbage on the convex platform in the pit, and then put the garbage box into the pit. Then retract the hanging box slide pin and lift the pressure head. Prepare to enter the next cycle of garbage compression process.